Betekenis van:
time lag

time lag
Zelfstandig naamwoord
  • naijleffect
  • time during which some action is awaited

Synoniemen

Hyperoniemen

Hyponiemen

Werkwoord


Voorbeeldzinnen

  1. abnormal time lag in brake operation at any wheel
  2. The transmission is subject to the time lag specified in Article 4(1).
  3. The first transmission is subject to the time lag specified in Article 4(1).
  4. ‘timeliness’ shall refer to the time lag between the availability of the information and the event or phenomenon it describes;
  5. It is the time interval, including the lag phase, needed to reach a value of 50 % biodegradation.
  6. However, with a time lag, starting in 2002 prices on the captive market showed a downward trend as well.
  7. Time lag between the actual delivery of the data and the target date when it should have been delivered.
  8. Prolonged incubation (several months) may be necessary if a long lag time occurs before a significant degradation of the test substance can be measured.
  9. ‘punctuality’ shall refer to the time lag between the date of the release of the data and the target date when it should have been delivered;
  10. There seems to have been no formal updating of the Ernst & Young evaluation before the sale took place, to take into account the time lag between the date of the evaluation and the date the land was sold to Konsum.
  11. The report concludes on this point that the time lag between the generation of the group's cash flow and the heavy short-term financial commitments (2003-2005) poses a problem of refinancing but not of solvency.
  12. If multiple flasks are used (to allow harvesting of whole flasks at each sampling time), the appropriate volume of test water is also about 100 ml, as small sample volumes may influence the length of the lag phase.
  13. However, it is reasonable to trust that peaks are indeed correlated since there is no significant time lag between the geographical areas and the three regions are subject to the same type of weather.
  14. The algorithms shall run flexibly by setting a pre-defined time lag between the application of different algorithms to ensure a minimum interval between the running of two algorithms.
  15. Paragraph 1 notwithstanding, licence applications for a quantity not exceeding 22 tonnes of products falling within CN codes 0201 and 0202 shall not be subject to the five-day time-lag.